
Origin circuit
Confirm collection point, terminal and handover party.
ROUTE CIRCUIT / C30·PKG
This page describes the initial service scope. Route, terminal, method and unit acceptance still require confirmation before handover.
Chat on WhatsApp
CIRCUIT ZONES / 03

Confirm collection point, terminal and handover party.

Match RORO or container with a verified sailing.

Confirm Sarawak port, receiver and optional land movement.
DECISION NODES / 06

The handover point depends on the actual route and booking. Do not travel to a terminal before confirmation.

Sailings and collection timing can change with port operations. A planning window follows a vehicle review.

Initial details, the checklist and handover updates move through WhatsApp once the service number is active.

The handover point depends on the actual route and booking. Do not travel to a terminal before confirmation.

Sailings and collection timing can change with port operations. A planning window follows a vehicle review.

Initial details, the checklist and handover updates move through WhatsApp once the service number is active.
SCOPE BREAKERS / 04
Confirm against the actual booking.
Confirm against the actual booking.
Confirm against the actual booking.
Confirm against the actual booking.